آخر الأخبارأخبارأخبار العالم

MRP Engineer

Ensure that material scheduling strategy and processes are in place and work effectivelyManage inventory risk and ensure that contingency plans are in placeEnsure that any Material Requirements Planning system (MRP) or IT system in place is effective and that data is accurate and up to date and resolve any issues as requiredPerform daily analysis to predict potential inventory problems.Schedule the supply of materials/components to meet operation (Projects ) requirements and minimum safety stock levelsPlan, develop, implement and evaluate processes for material delivery from supplier to point of fitMonitor inventory levels against agreed target levelsLink between different departments regarding raw materialsReducing the inventory rateControl and reduce OSMI (Obsolete & Slow Moving Inventory )

اظهر المزيد

اترك تعليقاً

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

زر الذهاب إلى الأعلى

أنت تستخدم إضافة Adblock

برجاء دعمنا عن طريق تعطيل إضافة Adblock